VERIDEX: A 10-Dimension Decision Engine for ERP Planning

T
TechnoPKG
2026-06-20 📖 4 min read 👁 13 views

Traditional ERP systems run Material Requirements Planning (MRP) and produce a list of planned orders — purchase orders to buy, work orders to make. What they don't produce is a clear recommendation about which planned orders to prioritise, why some carry more risk than others, and what to do when data is incomplete or supply constraints are severe.

VERIDEX fills that gap.

What VERIDEX Does

VERIDEX (Verified Decision Index) is TechnoPKG's proprietary 10-dimension decision scoring framework, developed as part of the OptiSys planning engine. For each sales order or planned supply requirement, VERIDEX calculates a composite score from 0 to 100 across ten dimensions. The score drives a clear release recommendation:

ScoreDecision
85–100Release Now
70–84Review / Partial Release
50–69Human Approval Required
30–49Hold / Escalate
0–29Block / Data Correction Required
This transforms the planner's task from reviewing hundreds of exception messages to acting on a prioritised decision queue.

The 10 Dimensions

Each dimension scores a specific aspect of the planning scenario:

1. Demand — How urgent is the customer requirement? Scores reflect due date proximity, customer priority, order quantity relative to forecast, and backlog age.

2. Supply — What is the supply position? On-hand inventory, open purchase orders, open work orders, and any alternate supply sources contribute to this dimension.

3. Inventory — What is the available-to-promise position after reservations? Safety stock coverage, shortage risk, and inventory aging all factor in.

4. BOM & Routing — Is the bill of materials complete and accurate? Are routings defined with valid resources? Incomplete BOM structures are a common source of planning failures that VERIDEX surfaces explicitly.

5. Capacity — Is there available capacity at the required work centres? Overloaded resources generate a lower score and flag for planner attention.

6. Supplier — How reliable is the supplying vendor? On-time delivery history, quality performance, lead time variability, and expediting risk are scored against supplier master data.

7. Customer — What is the strategic importance of the customer requiring this supply? High-priority customers and contractually committed orders receive elevated scores.

8. Financial / Contribution — What is the financial impact of fulfilling versus delaying this order? Margin contribution, expediting cost, and delay penalties are factored where data is available.

9. Compliance / Governance — Are there any policy blocks? Inactive items, blocked suppliers, closed periods, missing approvals, and policy violations create hard gates that force the score below the release threshold.

10. Confidence — How complete and reliable is the underlying data? A plan built on accurate, current data scores higher confidence than one relying on stale forecasts or unconfirmed supplier commitments.

Hard Gates

Certain conditions block release regardless of the composite score. These hard gates include:

  • Item does not exist in the master
  • BOM missing for a manufactured item
  • Routing missing for a manufactured item
  • Supplier marked as blocked or inactive
  • Transaction falls in a closed accounting period
  • Negative available quantity without explicit approval
A hard gate prevents the VERIDEX score from reaching the release threshold, forcing human review before any supply is committed.

How OptiSys Uses VERIDEX

OptiSys — the planning engine within TechnoPKG's ERP module — runs VERIDEX scoring automatically after each planning run. The OptiSys Decision Workbench presents planners with a scored, prioritised list of planned orders. For each order, planners can:

  • View the full dimension breakdown
  • See an AI-generated explanation of the score and key risk factors
  • Approve, partial-release, hold, or reject the planned order
  • Simulate an alternative scenario (different supplier, later date, different quantity)
  • Export the decision and its rationale for audit
This workflow significantly reduces planning cycle time. Instead of reviewing every exception report manually, planners focus on the decisions that most need human judgment — those in the 50–84 range where the score is uncertain.

Why This Approach

MRP was designed for a world where data was reliable, suppliers were predictable, and demand was relatively stable. Modern supply chains are none of those things. VERIDEX is designed for the reality that planners face: incomplete data, volatile demand, unreliable suppliers, and competing priorities.

By making the decision criteria explicit and the scoring transparent, VERIDEX also serves as a learning tool. New planners can see exactly why a planned order scored as it did, which dimensions are weak, and what data improvements would raise the score. This builds planning competence rather than creating dependence on a black-box recommendation.

VERIDEX is a TechnoPKG original framework — an independent scoring methodology, not affiliated with or derived from any commercial ERP product.


VERIDEX is a proprietary scoring framework developed by DhirajKumar Pathak for the TechnoPKG learning portal. All scores and decisions are for educational demonstration purposes. Not for production use without independent validation.

Tags: ERPPlanningVERIDEXOptiSysSupply ChainDecision Engine

Comments (0)

💬
No comments yet. Be the first to share your thoughts!
Sign in to leave a comment.
Table of Contents
Generating...
Share